Operation and Maintenance of Suppository Transfer Chute
1) Purpose
The purpose of this SOP is to outline the procedures for operating and maintaining the suppository transfer chute to ensure safe and efficient transfer of suppositories during the manufacturing process.
2) Scope
This SOP applies to all personnel involved in the operation, cleaning, and maintenance of the suppository transfer chute in the manufacturing facility.
3) Responsibilities
It is the responsibility of production operators, maintenance staff, and quality control personnel to follow this SOP to ensure proper operation and maintenance of the suppository transfer chute.
4) Procedure
4.1 Preparation
- Ensure the suppository transfer chute is clean and free of any residues before use.
- Verify the availability of suppositories ready for transfer.
- Inspect the transfer chute for any signs of wear or damage.
4.2 Transfer Process
- Position the transfer chute in alignment with the receiving container or equipment.
- Load suppositories into the chute according to batch requirements.
- Activate the transfer mechanism to move suppositories safely and efficiently.
4.3 Cleaning and Maintenance
- After completing the transfer process, clean the chute thoroughly using approved cleaning agents and procedures.
- Inspect and lubricate moving parts to ensure smooth operation.
5) Abbreviations, if any
N/A
6) Documents, if any
Batch production record, Cleaning log, Suppository transfer chute specifications
7) Reference, if any
GMP guidelines, Manufacturer’s operating manual for
8) SOP Version
Version 1.0