SOP Guide for Pharma

Aerosol: SOP for Reconciliation of In-Process Components – V 2.0

Aerosol: SOP for Reconciliation of In-Process Components – V 2.0

SOP for Reconciliation of In-Process Components

Department Aerosol
SOP No. SOP/Aerosol/078/2025
Supersedes SOP/Aerosol/078/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

This Standard Operating Procedure (SOP) outlines the process for the reconciliation of in-process components during aerosol manufacturing. The objective is to ensure that all components, such as raw materials, propellants, and aerosol containers, are accounted for during production. Proper reconciliation ensures that the correct quantities of materials are used, minimizing waste, preventing shortages, and maintaining compliance with regulatory requirements.

2. Scope

This SOP applies to all in-process components used in the manufacturing of aerosol products at [Company Name]. It covers the reconciliation process for raw materials, propellants, containers, and other components used during the production process to ensure that all materials are properly tracked and accounted for.

3. Responsibilities

  • Production Team: Responsible for ensuring that all in-process components are accurately tracked during the manufacturing process, reporting any discrepancies, and ensuring that the correct quantities of materials are used.
  • Quality Control (QC) Team: Responsible for reviewing the reconciliation of in-process components and verifying that the quantities used match the expected amounts, ensuring product integrity and compliance with specifications.
  • Warehouse Team: Responsible for providing accurate records of raw material deliveries and stock levels to facilitate
accurate reconciliation of in-process components.
  • Health and Safety Officer: Ensures that safety protocols are followed when handling materials and managing any discrepancies, particularly when dealing with hazardous materials or propellants.
  • 4. Accountability

    The Manufacturing Manager is accountable for ensuring that the reconciliation of in-process components is performed according to this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

    5. Procedure

    5.1. Pre-Reconciliation Preparation

    1. Ensure that all in-process components (raw materials, propellants, containers, etc.) are available and ready for reconciliation at each stage of production.
    2. Ensure that accurate records are maintained for the quantities of materials used, received, and dispensed, including batch numbers, lot numbers, and storage locations.
    3. Verify that the production team has accurately recorded the quantities of components used and the amount remaining at each stage of production.
    4. Prepare necessary equipment for the reconciliation process, including:
      • Inventory management software or tracking tools
      • Reconciliation forms or logs
      • PPE, including gloves, goggles, and lab coats

    5.2. Reconciliation Process

    1. At the beginning of each production run, the following components should be reconciled:
      • Raw materials (e.g., active ingredients, excipients)
      • Propellants (e.g., butane, propane)
      • Aerosol containers
      • Valves, actuators, and other packaging components
    2. During the production run:
      • Track the usage of each material and component using inventory management systems or manual logs.
      • At each stage of production (e.g., after filling, crimping), check that the amount of material used matches the expected usage based on production plans and batch sizes.
    3. If discrepancies are identified (e.g., excess or shortage of materials):
      • Immediately notify the production supervisor and initiate a root cause analysis to identify and resolve the issue.
      • Record any discrepancies in the Reconciliation Discrepancy Log (Annexure-1) and take corrective action as needed.
    4. At the end of the production run, perform a final reconciliation:
      • Compare the initial quantities of components with the final usage amounts to ensure that all materials were accounted for correctly.
      • Ensure that the remaining materials are returned to inventory and that all discrepancies are resolved.
      • Document the results of the reconciliation in the In-Process Reconciliation Log (Annexure-2).

    5.3. Post-Reconciliation Actions

    1. If the reconciliation is successful:
      • Proceed with the next production batch, ensuring that the reconciliation process is repeated at each stage of production.
      • Ensure that all reconciliation data is stored in the document management system for future audits.
    2. If discrepancies are found and not resolved:
      • Investigate the cause of the discrepancy (e.g., miscalculation, incorrect material usage, spillage).
      • Take corrective actions, such as adjusting material quantities, re-educating staff, or improving inventory control practices.
      • Document the corrective actions taken in the Corrective Action Log (Annexure-3).

    5.4. Calibration and Maintenance of Equipment

    1. Ensure that all equipment used for tracking and reconciling in-process components (e.g., scales, flow meters, inventory management software) is calibrated and maintained according to the manufacturer’s specifications.
    2. Perform routine maintenance on equipment used for reconciliation to ensure accuracy and reliability.
    3. Document all calibration and maintenance activities in the Equipment Calibration Log (Annexure-4) and the Equipment Maintenance Log (Annexure-5).

    5.5. Documentation and Record-Keeping

    1. Document all in-process reconciliation activities, including the material quantities received, used, and remaining, in the In-Process Reconciliation Log (Annexure-2).
    2. Ensure that all records, including discrepancy logs and corrective action reports, are reviewed by the QC team to ensure that the reconciliation process meets the required standards.
    3. Store all records in the document management system, ensuring they are available for future reference and audits.

    5.6. Safety and Environmental Considerations

    1. Ensure that all personnel involved in the reconciliation process wear appropriate PPE to prevent exposure to materials, including raw materials and propellants.
    2. Follow all safety protocols when handling hazardous materials or dealing with discrepancies in material usage, especially when dealing with pressurized containers or toxic substances.
    3. Ensure proper disposal of any waste generated during the reconciliation process, including non-conforming components and leftover materials, in accordance with environmental and safety regulations.

    6. Abbreviations

    • GMP: Good Manufacturing Practice
    • QC: Quality Control
    • PPE: Personal Protective Equipment
    • SOP: Standard Operating Procedure

    7. Documents

    1. In-Process Reconciliation Log (Annexure-2)
    2. Reconciliation Discrepancy Log (Annexure-1)
    3. Corrective Action Log (Annexure-3)
    4. Equipment Calibration Log (Annexure-4)
    5. Equipment Maintenance Log (Annexure-5)

    8. References

    This SOP is based on the following regulatory guidelines and industry standards:

    • Good Manufacturing Practice (GMP) Guidelines
    • FDA Code of Federal Regulations (CFR) Title 21, Part 211
    • ISO 9001:2015 – Quality Management Systems

    9. SOP Version

    Version: 2.0

    10. Approval Section

    Prepared By Checked By Approved By
    Signature
    Date
    Name
    Designation
    Department

    11. Annexures

    Annexure-1: Reconciliation Discrepancy Log

    Component Discrepancy Description Corrective Action Operator Name Remarks
    Propellant Excess usage Adjusted machine settings Rajesh Patel No further issues found

    Annexure-2: In-Process Reconciliation Log

    Component Received Quantity Used Quantity Remaining Quantity Operator Name Remarks
    Propellant 500 L 450 L 50 L Rajesh Patel Checked and recorded

    Annexure-3: Corrective Action Log

    You said: Continue ChatGPT said: Here is the continuation of the SOP for Topic 78: SOP for Reconciliation of In-Process Components: html Copy Edit

    Component Issue Date Issue Description Corrective Action Operator Name
    Propellant 06/02/2025 Excess usage detected Adjusted filling process Rajesh Patel

    Annexure-4: Equipment Calibration Log

    Equipment ID Calibration Date Calibration Results Operator Name Remarks
    FILL-001 06/02/2025 Pass Rajesh Patel No adjustments required

    Annexure-5: Equipment Maintenance Log

    Equipment ID Maintenance Date Tasks Performed Operator Name Remarks
    FILL-001 06/02/2025 Cleaned and calibrated Rajesh Patel No issues found

    12. Revision History:

    Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
    01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
    01/01/2025 V 2.0 Updated reconciliation process To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
    Exit mobile version