Capsule: SOP for Addressing Equipment Malfunctions During Encapsulation – V 2.0

Capsule: SOP for Addressing Equipment Malfunctions During Encapsulation – V 2.0

Standard Operating Procedure for Addressing Equipment Malfunctions During Encapsulation

Department Capsule Manufacturing
SOP No. SOP/CM/108/2025
Supersedes SOP/CM/108/2022
Page No. Page 1 of 6
Issue Date 01/02/2025
Effective Date 05/02/2025
Review Date 01/02/2026

1. Purpose

The purpose of this SOP is to establish the procedure for addressing equipment malfunctions during the encapsulation process. Identifying and rectifying malfunctions promptly is essential to maintaining production efficiency, product quality, and compliance with Good Manufacturing Practices (GMP).

2. Scope

This SOP applies to all capsule manufacturing equipment, including capsule filling machines, encapsulation systems, and related equipment. It covers the procedures for identifying, troubleshooting, and rectifying malfunctions during the encapsulation process.

3. Responsibilities

4. Accountability

The Capsule Manufacturing Supervisor is accountable for ensuring that all equipment malfunctions are addressed promptly, and production is not delayed. The Maintenance Manager is accountable for ensuring that equipment repairs are performed effectively, while the QA Manager is responsible for ensuring that product quality standards are met post-repair.

5. Procedure

5.1 Identifying Equipment Malfunctions

The first step in addressing equipment malfunctions is to identify issues as early as possible:

  1. Monitor Equipment Performance
    1. Regularly monitor the performance of capsule filling machines and other related equipment during production. Check for abnormalities such as irregular fill volumes, capsule leakage, or incomplete sealing.
    2. Ensure that operators are trained to recognize equipment malfunctions, such as strange noises, abnormal vibration, or error messages on the control panels.
  2. Report Malfunctions
    1. If an issue is detected, the production operator should immediately report the malfunction to the Production Supervisor and the Maintenance Team.
    2. Record the issue in the Equipment Malfunction Log (Annexure-1) with details of the malfunction, time of occurrence, and any relevant observations.

5.2 Troubleshooting Equipment Issues

Once a malfunction is reported, follow the troubleshooting process to identify the root cause:

  1. Consult Equipment Manuals
    1. Refer to the equipment manuals and troubleshooting guides for specific machines involved in the malfunction. Follow the manufacturer’s recommendations for addressing the issue.
  2. Perform Diagnostics
    1. The Maintenance Team should run diagnostic tests, if available, to detect any electrical or mechanical issues with the equipment.
    2. If the malfunction involves a mechanical failure, check for issues such as blockages, wear and tear, or component misalignment.
  3. Identify and Correct the Problem
    1. After diagnosing the malfunction, perform the necessary repairs or adjustments. Common fixes may involve recalibration, replacing faulty components, or cleaning the equipment to remove blockages.
    2. Ensure that any damaged components are replaced with certified spare parts to maintain equipment performance and ensure GMP compliance.

5.3 Testing and Verifying Equipment after Repairs

Once repairs are made, conduct tests to ensure that the equipment is functioning properly:

  1. Test the Equipment
    1. After making repairs, conduct a series of tests to verify that the machine is operating correctly. This may involve running a few test batches to check capsule fill volumes, sealing, and weight consistency.
    2. Ensure that all functions of the equipment are restored to their original specifications, such as filling speed, capsule alignment, and sealing integrity.
  2. Document Test Results
    1. Record the test results in the Equipment Verification Log (Annexure-2) to confirm that the equipment has passed all tests and is ready to resume production.
    2. Ensure that the test results are reviewed and approved by the Production Supervisor and the QA team.

5.4 Resuming Production

Once the malfunction is resolved and the equipment is verified to be functioning properly, proceed with resuming production:

  1. Resume Production
    1. Once the equipment passes all tests, production can resume. Ensure that production operators are informed that the issue has been resolved and that they are ready to continue the process.
  2. Monitor the Equipment
    1. Monitor the equipment closely during the initial production runs after the malfunction is addressed. Pay attention to any signs that the problem might recur.

5.5 Documentation and Reporting

Proper documentation of the malfunction, corrective actions, and testing is essential for traceability and regulatory compliance:

  1. Document the Malfunction
    1. Complete the Equipment Malfunction Log (Annexure-1) with all relevant details about the malfunction, the root cause, and the actions taken to correct the issue.
  2. Complete the Equipment Verification Log
    1. After completing the repairs and tests, ensure that the Equipment Verification Log (Annexure-2) is updated to reflect that the equipment is back to its operational state.

6. Abbreviations

7. Documents

  1. Equipment Malfunction Log (Annexure-1)
  2. Equipment Verification Log (Annexure-2)
  3. Deviation Log (Annexure-3)
  4. Maintenance Log (Annexure-4)

8. References

9. SOP Version

Version: 2
You said:
​continue
ChatGPT said:
Certainly! Continuing from SOP 108: SOP for Addressing Equipment Malfunctions During Encapsulation, here is the remainder:

html
Copy

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Equipment Malfunction Log

Malfunction ID Batch ID Description Root Cause Corrective Action Operator Approval Status
MF-001 Batch 001 Capsule filling machine stopped unexpectedly Electrical short-circuit in motor Replaced motor and reset machine settings John Doe Approved

Annexure-2: Equipment Verification Log

Test ID Test Description Test Result Operator Verification Date
TEST-001 Filling accuracy test Pass Jane Smith 02/02/2025

Annexure-3: Deviation Log

Deviation ID Batch ID Description Corrective Action Operator Approval Status
DEV-001 Batch 001 Irregular capsule weight Recalibrated the capsule filling machine John Doe Approved

Annexure-4: Maintenance Log

Equipment ID Maintenance Date Maintenance Activity Performed By Next Maintenance Due
Filling Machine 001 02/02/2025 Replaced motor and calibrated sensors Jane Smith 02/02/2026

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP Creation QA Head
01/02/2025 2.0 Updated troubleshooting and corrective action procedures Clarified equipment malfunction handling QA Head