SOP for Cleaning Pipes and Valves in Equipment – V 2.0

Procedure for Cleaning Pipes and Valves in Equipment

Department Production/Engineering/Quality Assurance (QA)
SOP No. SOP/Ointment/057
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define a standardized process for cleaning pipes and valves in equipment used for ointment manufacturing. Proper cleaning prevents cross-contamination, maintains process efficiency, and ensures compliance with Good Manufacturing Practices (GMP).

2. Scope

This SOP applies to all personnel involved in the cleaning and maintenance of pipes and valves in ointment manufacturing equipment.

3. Responsibilities

4. Accountability

The Production, Engineering, and QA Managers are accountable for ensuring that cleaning of pipes and valves follows GMP standards and is properly documented.

5. Procedure

5.1 Pre-Cleaning Preparations

5.2 Disassembling Pipes and Valves

5.3 Cleaning Process

5.3.1 Initial Rinsing

5.3.2 Detergent Cleaning

5.3.3 High-Pressure Rinsing

5.3.4 Final Sanitization

5.4 Drying and Reassembly

5.5 Post-Cleaning Inspection

5.6 Documentation and Approval

6. Abbreviations

7. Documents

8. References

9. SOP Version

Version 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Cleaning Log

Date Pipe/Valve ID Cleaning Solution Used Sanitization Agent Verified By
01/02/2025 PV-101 Detergent Solution 70% Ethanol QA Officer
02/02/2025 PV-102 Alkaline Cleaner Peracetic Acid QA Officer

Annexure-2: Cleaning Validation Report

Date Pipe/Valve ID Swab Test Result Microbial Limits Final Status Approved By
01/02/2025 PV-101 Pass Within Limit Approved QA Head
02/02/2025 PV-102 Pass Within Limit Approved QA Head

12. Revision History:

Revision Date Revision No. Details of Revision Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP QA Head
01/02/2025 2.0 Updated SOP Format Standardization of Document QA Head