SOP Guide for Pharma

Ointments: SOP for Documentation of Equipment Validation – V 2.0

SOP for Documentation of Equipment Validation – V 2.0

Procedure for Documentation of Equipment Validation

Department Quality Assurance (QA)/Validation/Engineering/Production
SOP No. SOP/Ointment/136
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define the process for documenting equipment validation activities in ointment manufacturing. Proper documentation ensures compliance with regulatory requirements, traceability, and verification of validation processes.

2. Scope

This SOP applies to all personnel in the Quality Assurance (QA), Validation, Engineering, and Production departments responsible for executing, reviewing, and maintaining documentation for equipment validation.

3. Responsibilities

  • QA Officer: Ensures accurate and complete validation documentation.
  • Validation Team: Develops, executes, and maintains validation documents.
  • Engineering Team: Provides equipment specifications and installation records.
  • Production Supervisor: Records operational data for validation activities.
  • QA Manager: Reviews and approves validation records and reports.

4. Accountability

The QA and Validation Managers are accountable for ensuring that equipment validation documentation complies with GMP, FDA, ICH, and WHO guidelines.

5. Procedure

5.1 Types of Equipment Validation Documents

  • Validation Master Plan (VMP)
  • Installation Qualification (IQ) Protocol and Report
  • Operational Qualification (OQ) Protocol and Report
  • Performance Qualification (PQ) Protocol and Report
  • Requalification Reports
  • Deviation and CAPA (Corrective and Preventive Action) Reports

5.2 Documentation of Validation Activities

  • Maintain structured records for each stage of validation.
  • Ensure each record includes:
    • Equipment details (ID, model, manufacturer)
    • Test parameters
and acceptance criteria
  • Validation methodology and test procedures
  • Results and deviations (if any)
  • Assign a unique identification number to each validation document.
  • 5.3 Review and Approval of Validation Documents

    • QA must review all validation records for completeness and compliance.
    • Engineering and Validation teams must verify recorded data.
    • QA Manager must approve final validation reports before equipment is released for production.

    5.4 Storage and Retention of Validation Documents

    • Store validation documents in a controlled and accessible location.
    • Retain records as per regulatory retention requirements.
    • Ensure validation records are available for regulatory audits and inspections.

    6. Abbreviations

    • GMP – Good Manufacturing Practices
    • QA – Quality Assurance
    • IQ – Installation Qualification
    • OQ – Operational Qualification
    • PQ – Performance Qualification
    • CAPA – Corrective and Preventive Action

    7. Documents

    • Equipment Validation Record Log (Annexure-1)
    • Equipment Validation Summary Report (Annexure-2)

    8. References

    • ICH Q7 – Good Manufacturing Practice Guide
    • WHO Guidelines for Equipment Validation
    • US FDA Guidance on Validation Documentation

    9. SOP Version

    Version 2.0

    10. Approval Section

    Prepared By Checked By Approved By
    Signature
    Date
    Name
    Designation
    Department

    11. Annexures

    Annexure-1: Equipment Validation Record Log

    Date Equipment ID Validation Phase Test Performed Result Reviewed By
    01/02/2025 MIX-1001 IQ Installation Verification Pass QA Manager
    02/02/2025 FILL-2002 PQ Batch Performance Pass QA Manager

    Annexure-2: Equipment Validation Summary Report

    Validation ID Validation Type Approval Date Final Status Approved By
    EV-2025-001 Routine Equipment Validation 01/02/2025 Approved QA Manager
    EV-2025-002 Change Control Validation 05/02/2025 Approved QA Manager

    12. Revision History:

    Revision Date Revision No. Details of Revision Reason for Revision Approved By
    01/01/2024 1.0 Initial Version New SOP QA Head
    01/02/2025 2.0 Updated SOP Format Standardization of Document QA Head
    Exit mobile version