SOP Guide for Pharma

Ointments: SOP for Handling Deviations in Ointment Manufacturing – V 2.0

SOP for Handling Deviations in Ointment Manufacturing – V 2.0

Procedure for Handling Deviations in Ointment Manufacturing

Department Production/Quality Assurance (QA)/Quality Control (QC)
SOP No. DM-030
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define a structured approach for identifying, documenting, investigating, and resolving deviations in ointment manufacturing. Proper deviation management ensures compliance with GMP standards and prevents potential product quality issues.

2. Scope

This SOP applies to all personnel involved in the ointment manufacturing process, including production, quality control (QC), and quality assurance (QA) teams.

3. Responsibilities

4. Accountability

The QA Manager is accountable for ensuring that all deviations are recorded, investigated, and resolved as per GMP standards.

5. Procedure

5.1 Types of Deviations

5.2 Identification and Reporting

5.3 Investigation of Deviations

5.4 Corrective and Preventive Actions (CAPA)

5.5 Documentation and Approval

6. Abbreviations

7. Documents

8. References

9. SOP Version

Version 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Deviation Log

Date Batch Number Deviation Type Description Reported By Verified By
01/02/2025 DM-001 Minor Mixing time exceeded by 2 minutes John Doe QA Officer
02/02/2025 DM-002 Major Temperature fluctuation during cooling Jane Smith QA Officer

Annexure-2: Deviation Investigation Report

Date Batch Number Root Cause Impact on Quality Investigation By Final Decision
01/02/2025 DM-001 Operator error No impact QA Team Approved
02/02/2025 DM-002 Equipment malfunction Requires reprocessing QA Team Rework

Annexure-3: CAPA Report

Date Batch Number Corrective Action Preventive Action Implemented By Verified By
01/02/2025 DM-001 Retraining of staff Revised SOP Production Team QA Officer
02/02/2025 DM-002 Repaired cooling system Periodic maintenance schedule Engineering QA Officer

12. Revision History:

Revision Date Revision No. Details of Revision Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP QA Head
01/02/2025 2.0 Updated SOP Format Standardization of Document QA Head
Exit mobile version