1) Purpose

The purpose of this SOP is to outline the procedure for managing change control activities during the formulation development process, ensuring that changes are controlled, documented, and implemented in a systematic manner to maintain product quality and compliance with regulatory requirements.

2) Scope

This SOP applies to all formulation development projects within the organization, covering the management of change control for new formulations, processes, specifications, and other changes.

3) Responsibilities

The responsibilities for this SOP include:
Formulation Development Team: Initiating change control requests and providing technical justification for proposed changes.
Quality Assurance: Reviewing and approving change control requests to ensure compliance with regulatory standards and quality management systems.
Regulatory Affairs: Assessing the impact of changes on regulatory filings and ensuring regulatory compliance.
Project Management: Coordinating cross-functional reviews and approvals for change control requests.

4) Procedure

4.1 Change Control Request Initiation

  1. Identify the need for a change based on internal assessments, feedback from stakeholders, or regulatory requirements.
  2. Complete a change control request form detailing the nature of the change, rationale, and potential impact on product quality and regulatory compliance.
  3. Submit the change control request for initial review and approval by relevant stakeholders.

4.2 Technical Assessment and Impact Analysis

    type="a">
  1. Conduct a technical assessment of the proposed change to evaluate its feasibility, risks, and potential impact on product quality.
  2. Perform an impact analysis to determine the scope of changes required, including revisions to documents, procedures, and regulatory filings.
  3. Document findings from the technical assessment and impact analysis in the change control request form.
  4. 4.3 Review and Approval

    1. Route the change control request through cross-functional teams, including formulation development, quality assurance, regulatory affairs, and project management.
    2. Review and approve the change control request based on technical justification, impact analysis, and compliance with regulatory requirements.
    3. Obtain final approval from designated authorities before proceeding with implementation of the change.

    4.4 Implementation and Verification

    1. Implement approved changes according to documented procedures and timelines.
    2. Verify the effectiveness of implemented changes through validation studies, testing, or other verification activities.
    3. Update relevant documentation, including standard operating procedures (SOPs), batch records, and regulatory submissions, as applicable.

    4.5 Documentation and Closure

    1. Document all change control activities, including change requests, approvals, implementation details, and verification results.
    2. Close the change control request upon completion of all required actions and ensure final documentation is archived for future reference and audits.

    5) Abbreviations, if any

    SOP: Standard Operating Procedure

    6) Documents, if any

    Change Control Request Form
    Technical Assessment Reports
    Impact Analysis Documents
    Updated SOPs and Documentation

    7) Reference, if any

    – FDA Guidance for Industry: Change Control Procedures
    – ICH Q10: Pharmaceutical Quality System

    8) SOP Version

    Version 1.0