SOP Guide for Pharma

SOP for Formulation of Nasal Drops




SOP for Formulation of Nasal Drops



Standard Operating Procedure for Formulation of Nasal Drops

1) Purpose

This SOP outlines the procedures required for the formulation and preparation of nasal drops. The aim is to ensure accurate dosing, uniform distribution, and stability of the nasal drops for effective drug delivery.

2) Scope

This SOP applies to personnel involved in the formulation, preparation, and quality control of nasal drops at [Company Name]. It includes the steps for ingredient selection, preparation, testing, and packaging of nasal drop formulations.

3) Responsibilities

4) Procedure

4.1 Preparation of Materials

4.1.1 Selection of Active Ingredients and Excipients

4.1.2 Weighing of Ingredients

4.2 Formulation of Nasal Drops

4.2.1 Preparation of Solution

4.2.2 pH Adjustment

4.2.3 Filtration

4.3 Filling and Packaging

4.3.1 Filling Process

4.3.2 Packaging

4.4 Quality Control

4.4.1 pH and Osmolality Testing

4.4.2 Homogeneity Testing

4.5 Stability Testing

4.5.1 Long-Term Stability Testing

4.5.2 Accelerated Stability Testing

4.6 Documentation

4.7 Equipment Cleaning and Calibration

5) Abbreviations, if any

6) Documents, if any

7) References, if any

8) SOP Version

Version 1.0

Annexure

1. pH and Osmolality Testing Log Template

Date Formulation pH Osmolality (mOsm/kg) Operator Initials QA Approval
DD/MM/YYYY Formulation Name pH Value Osmolality Operator Name QA Name
           

2. Homogeneity Testing Log Template

Date Formulation Test Point (Top/Middle/Bottom) Active Ingredient Concentration (%) Operator Initials QA Approval
DD/MM/YYYY Formulation Name Test Point Concentration Operator Name QA Name
           

3. Stability Testing Log Template

Date Formulation Storage Conditions Time Interval Stability Results Operator Initials QA Approval
DD/MM/YYYY Formulation Name Temperature and Humidity 1 month, 3 months, etc. Pass/Fail Operator Name QA Name
           

4. Cleaning Log Template

Date Equipment ID Cleaning Procedure Operator Initials QA Approval
DD/MM/YYYY Equipment Name/ID Cleaning Method Operator Name QA Name
           

5. Calibration Log Template

Date Equipment ID Calibration Procedure Calibration Results Operator Initials QA Approval
DD/MM/YYYY Equipment Name/ID Calibration Method Pass/Fail Operator Name QA Name
           


Exit mobile version