1) Purpose

The purpose of this SOP is to establish procedures for conducting freeze-thaw stability testing on aerosol products to evaluate product integrity and performance under freezing and thawing conditions.

2) Scope

This SOP applies to freeze-thaw stability testing performed on aerosol products manufactured by [Company Name] to assess product stability and quality throughout storage and distribution.

3) Responsibilities

Quality Control (QC) Team: Perform freeze-thaw stability testing according to approved protocols and acceptance criteria.
Production Team: Provide aerosol products for testing and coordinate sample collection.
Engineering Team: Maintain freeze-thaw chambers and equipment to ensure accurate and repeatable testing conditions.
Regulatory Affairs: Review and approve testing protocols to ensure compliance with regulatory requirements.

4) Procedure

4.1 Equipment Setup and Calibration:
4.1.1 Ensure freeze-thaw chambers and monitoring equipment are calibrated and maintained according to manufacturer specifications.
4.1.2 Verify equipment functionality and performance prior to testing by conducting temperature mapping and validation studies.
4.1.3 Record calibration and validation activities in the equipment logbook.

See also  SOP for Label Inspection for Aerosols

4.2 Sample Selection and Preparation:
4.2.1 Select representative samples of aerosol products from production batches or stability studies for freeze-thaw stability testing.
4.2.2 Ensure samples are labeled and identified to maintain traceability throughout testing.
4.2.3 Equilibrate samples to specified storage conditions (e.g., room temperature) before initiating freeze-thaw cycles.

4.3 Freeze-Thaw Cycling Conditions:
4.3.1 Define freeze-thaw cycling parameters including number of cycles, temperature extremes, and duration of each cycle.
4.3.2 Program freeze-thaw chambers to alternate between freezing (e.g., -20°C) and thawing (e.g., +25°C) conditions according to defined cycles.
4.3.3 Monitor and record temperature fluctuations within the chambers to ensure adherence to programmed conditions.

4.4 Testing Duration:
4.4.1 Conduct freeze-thaw stability testing for a predetermined number of cycles based on product-specific requirements and regulatory guidelines.
4.4.2 Perform periodic evaluations of samples during testing intervals to assess changes in product appearance, physical integrity, and performance.
4.4.3 Document observations and measurements of sample responses to freeze-thaw cycling conditions.

See also  SOP for Safety and Environmental Controls in Aerosol Manufacturing

4.5 Evaluation and Acceptance Criteria:
4.5.1 Evaluate test results against predefined acceptance criteria for product stability and performance parameters.
4.5.2 Assess changes in aerosol product attributes including but not limited to leakage, formulation integrity, propellant stability, and container integrity.
4.5.3 Document all test results, including pass/fail determinations and deviations encountered during testing.

4.6 Reporting and Documentation:
4.6.1 Prepare comprehensive test reports summarizing freeze-thaw stability testing methods, results, and interpretations.
4.6.2 Review and approve test reports by designated personnel to ensure accuracy and compliance with SOPs.
4.6.3 Maintain records of all freeze-thaw stability testing activities, including raw data, test protocols, and approval documentation.

4.7 Non-Conformance Handling:
4.7.1 Initiate non-conformance reports (NCRs) for aerosol products that fail freeze-thaw stability testing, documenting reasons for failure and corrective actions taken.
4.7.2 Implement corrective actions to address identified issues, such as modifying product formulation or packaging materials.
4.7.3 Verify effectiveness of corrective actions through retesting and document outcomes accordingly.

See also  SOP for Batch Reconciliation in Aerosol Production

5) Abbreviations, if any

SOP: Standard Operating Procedure
QC: Quality Control
NCR: Non-Conformance Report

6) Documents, if any

Freeze-Thaw Stability Testing Protocol
Freeze-Thaw Stability Test Reports
Equipment Calibration Records
Non-Conformance Reports (NCRs)
Approval Records and Documentation

7) Reference, if any

ICH Q1A(R2): Stability Testing of New Drug Substances and Products
ISO 11607-1: Packaging for Terminally Sterilized Medical Devices – Part 1: Requirements for Materials, Sterile Barrier Systems, and Packaging Systems
USP Chapter Aerosols – Determination of Leak Rate

8) SOP Version