SOP Guide for Pharma

SOP for Identification and Management of High-Risk Raw Materials in Storage – V 2.0

SOP for Identification and Management of High-Risk Raw Materials in Storage – V 2.0

Standard Operating Procedure for Identification and Management of High-Risk Raw Materials in Storage

Department Warehouse / Quality Assurance / Safety Department
SOP No. SOP/RM/141/2025
Supersedes SOP/RM/141/2022
Page No. Page 1 of 15
Issue Date 10/03/2025
Effective Date 17/03/2025
Review Date 10/03/2026

1. Purpose

This Standard Operating Procedure (SOP) outlines the procedures for the identification, classification, storage, and management of high-risk raw materials, ensuring compliance with Good Manufacturing Practices (GMP) and safety regulations.

2. Scope

This SOP applies to all high-risk raw materials, including but not limited to hazardous chemicals, flammable substances, toxic materials, and materials requiring special storage conditions within the warehouse facility.

3. Responsibilities

4. Accountability

The Warehouse Manager and Safety Officer are accountable for the safe identification and management of high-risk raw materials. The QA Manager is responsible for reviewing documentation and ensuring compliance with GMP standards.

5. Procedure

5.1 Identification and Classification

  1. Initial Identification:
    • Review the Safety Data Sheets (SDS) provided by the supplier to classify materials as high-risk based on toxicity, flammability, reactivity, or environmental hazards.
    • Label materials with hazard symbols according to the Globally Harmonized System (GHS) standards.
    • Document the classification in the High-Risk Material Identification Log (Annexure-1).
  2. Periodic Review:
    • Review high-risk material classifications quarterly to ensure they meet current safety standards.
    • Update labels and documentation as necessary based on new safety information.

5.2 Storage and Handling Procedures

  1. Designated Storage Areas:
    • Store high-risk materials in designated, clearly marked areas with restricted access.
    • Ensure that flammable and reactive materials are stored separately in compliance with safety guidelines.
    • Document storage conditions in the High-Risk Material Storage Log (Annexure-2).
  2. Personal Protective Equipment (PPE):
    • Ensure all personnel handling high-risk materials are equipped with appropriate PPE, including gloves, goggles, and respirators.
    • Record PPE usage in the PPE Compliance Log (Annexure-3).

5.3 Risk Mitigation and Emergency Procedures

  1. Risk Assessment:
    • Conduct risk assessments for all high-risk materials, identifying potential hazards and implementing control measures.
    • Document risk assessments in the Risk Assessment Log (Annexure-4).
  2. Emergency Response:
    • Develop emergency procedures for handling spills, exposures, or fires involving high-risk materials.
    • Ensure all personnel are trained in emergency response protocols.
    • Document emergency drills and responses in the Emergency Response Log (Annexure-5).

5.4 Documentation and Review

  1. Record-Keeping Requirements:
    • Maintain all records related to the identification, storage, and management of high-risk materials for a minimum of five years.
    • Ensure records are available for regulatory inspections and internal audits.
    • Document record retention in the Record Retention Log (Annexure-6).
  2. Review and Continuous Improvement:
    • QA and Safety Officers shall review high-risk material management procedures quarterly and recommend improvements as needed.
    • Document review findings in the Management Review Log (Annexure-7).

6. Abbreviations

7. Documents

  1. High-Risk Material Identification Log (Annexure-1)
  2. High-Risk Material Storage Log (Annexure-2)
  3. PPE Compliance Log (Annexure-3)
  4. Risk Assessment Log (Annexure-4)
  5. Emergency Response Log (Annexure-5)
  6. Record Retention Log (Annexure-6)
  7. Management Review Log (Annexure-7)

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: High-Risk Material Identification Log

Date Material Name Classification (Flammable/Toxic/Reactive) Batch Number Identified By
10/03/2025 Acetone Flammable ACT-1234 Ravi Kumar

Annexure-2: High-Risk Material Storage Log

Date Material Name Batch Number Storage Location Storage Conditions Stored By
10/03/2025 Acetone ACT-1234 Flammable Storage Cabinet A1 Temperature: 20°C, Ventilated Ravi Kumar
10/03/2025 Hydrochloric Acid HCL-5678 Corrosive Materials Room B3 Temperature: 22°C, Isolated from bases Neha Verma

Annexure-3: PPE Compliance Log

Date Employee Name Material Handled PPE Used Compliance Status Checked By
10/03/2025 Amit Joshi Acetone Gloves, Respirator, Safety Goggles Compliant Priya Singh
10/03/2025 Neha Verma Hydrochloric Acid Chemical-Resistant Apron, Gloves, Face Shield Compliant Ravi Kumar

Annexure-4: Risk Assessment Log

Date Material Name Risk Identified Severity Level Control Measures Implemented Assessed By
10/03/2025 Acetone Flammability risk near heat sources High Stored in flammable cabinet, away from ignition Priya Singh
10/03/2025 Hydrochloric Acid Corrosive risk to skin and eyes Medium Use of PPE and isolated storage Ravi Kumar

Annexure-5: Emergency Response Log

Date Emergency Type Material Involved Response Actions Taken Outcome Reported By
10/03/2025 Spill Acetone Evacuated area, used spill kit, ventilated room Area cleared and material safely contained Neha Verma
10/03/2025 Exposure Hydrochloric Acid Administered first aid, flushed skin with water Minor injury, no further action required Amit Joshi

Annexure-6: Record Retention Log

Date Document Name Retention Period Stored By Storage Location
10/03/2025 High-Risk Material Storage Log 5 Years Priya Singh (QA) Document Control Room A
10/03/2025 Emergency Response Log 5 Years Ravi Kumar Document Control Room B

Annexure-7: Management Review Log

Date Review Type Findings Recommendations Reviewed By
10/03/2025 Quarterly Review Improper segregation of flammable and corrosive materials Rearrange storage areas, reinforce training Priya Singh (QA)
10/03/2025 Annual Review PPE compliance satisfactory, minor labeling issues Standardize hazard labeling procedures Ravi Kumar

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP Implementation QA Head
10/03/2025 2.0 Updated risk management protocols and emergency procedures Alignment with updated GMP and OSHA guidelines QA Head