SOP for Prototyping Medical Devices

SOP for Prototyping Medical Devices

Comprehensive Guide to Prototyping Medical Devices

1) Purpose

The purpose of this SOP is to outline a systematic approach for prototyping medical devices. Prototyping ensures that concepts are translated into functional models, enabling validation of design features, testing of functionality, and identification of potential design improvements. This process is essential to mitigate risks, optimize design, and ensure compliance with medical device standards.

2) Scope

This SOP applies to all personnel involved in the prototyping phase of medical device development. It covers activities from initial concept model creation to iterative prototyping and final prototype testing. It is applicable to all types of medical devices, including Class I, II, and III devices, and includes mechanical, electronic, and software components.

3) Responsibilities

– Design Engineers: Responsible for creating and iterating prototype designs.
– Project Manager: Ensures resources and timelines for prototyping are managed effectively.
– Prototype Fabrication Team: Handles the manufacturing of prototypes using appropriate tools and materials.
– Testing and Validation Team: Conducts testing of prototypes and provides feedback for improvements.
– Regulatory Affairs Team: Ensures that prototypes comply with applicable regulatory standards.

4) Procedure

4.1 Phase 1: Preparation for Prototyping
4.1.1 Define Objectives:
– Clearly identify the purpose of the prototype (e.g., functionality

testing, usability studies, or proof of concept).
4.1.2 Select Prototyping Methodology:
– Determine the appropriate prototyping technique, such as 3D printing, CNC machining, or virtual prototyping, based on the device requirements.
4.1.3 Procure Materials and Tools:
– Source approved materials and tools required for prototype development.

4.2 Phase 2: Initial Prototype Development
4.2.1 Create CAD Models:
– Develop detailed 3D CAD models of the device components.
4.2.2 Fabricate Prototype:
– Use the selected prototyping technique to create the initial physical model.
4.2.3 Assemble Prototype:
– Assemble the components of the prototype to create a functional model, ensuring that all parts fit as intended.

4.3 Phase 3: Prototype Testing and Evaluation
4.3.1 Conduct Functionality Tests:
– Test the prototype for operational functionality, including movement, responsiveness, and accuracy.
4.3.2 Usability Testing:
– Engage end-users (e.g., clinicians, technicians) to provide feedback on the prototype’s design, handling, and usability.
4.3.3 Safety Assessment:
– Perform risk analysis and ensure the prototype does not pose safety risks during testing.
4.3.4 Document Results:
– Record all test outcomes, issues identified, and areas for improvement.

4.4 Phase 4: Iterative Prototyping
4.4.1 Incorporate Feedback:
– Update the prototype design based on feedback and testing outcomes.
4.4.2 Develop Improved Versions:
– Fabricate new iterations of the prototype, incorporating refinements and improvements.
4.4.3 Validate Changes:
– Test updated prototypes to validate the effectiveness of implemented changes.

4.5 Phase 5: Final Prototype Approval
4.5.1 Review Prototype Documentation:
– Ensure all design, testing, and modification records are complete and accurate.
4.5.2 Conduct Design Review Meeting:
– Present the final prototype to stakeholders for approval.
4.5.3 Obtain Approval:
– Secure formal approval for the final prototype before proceeding to design verification or clinical trials.

5) Abbreviations

– CAD: Computer-Aided Design
– CNC: Computer Numerical Control
– FMEA: Failure Mode and Effects Analysis

6) Documents

– CAD Drawings and Models
– Prototyping Plans and Schedules
– Prototype Testing Reports
– Risk Analysis Documents
– Stakeholder Review Records

7) Reference

– ISO 13485: Medical devices – Quality management systems
– ISO 14971: Application of Risk Management to Medical Devices
– IEC 62304: Medical device software – Software life cycle processes

8) SOP Version

– Version: 1.0
– Effective Date: DD/MM/YYYY
– Approved by: [Name/Title]

Annexure

Annexure 1: Prototype Testing Log

Prototype ID Date Tested Test Conducted Outcome Recommendations
ID Number DD/MM/YYYY Functional Testing Pass/Fail Next Steps
         

Annexure 2: Prototyping Iteration Log

Iteration No. Date Changes Made Reason for Change Outcome
1 DD/MM/YYYY Modified handle design Improved ergonomics Accepted
         