Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

SOP for Responding to Power Outages in Manufacturing Areas

Posted on By

SOP for Responding to Power Outages in Manufacturing Areas

Standard Operating Procedure for Responding to Power Outages in Manufacturing Areas

1) Purpose

The purpose of this SOP is to establish clear procedures for responding to power outages in manufacturing areas to minimize disruption, ensure personnel safety, and protect equipment and processes.

2) Scope

This SOP applies to all employees, supervisors, and technical teams in the facility and covers response actions during planned and unplanned power outages, including the use of backup systems and post-outage recovery.

3) Responsibilities

  • Supervisors: Coordinate team activities during a power outage and ensure compliance with this SOP.
  • Maintenance Team: Inspect and restore power systems, including backup generators and UPS (Uninterruptible Power Supply) units.
  • Safety Officers: Monitor safety protocols during outages to prevent accidents and ensure emergency lighting is operational.
  • Operators: Follow procedures to safely shut down and restart equipment as required.

4) Procedure

4.1 Immediate Actions During a Power Outage

  1. Identify the Outage:
    • Confirm the power outage by checking facility systems and external sources (e.g., utility providers).
    • Determine whether the outage is localized or facility-wide.
  2. php
    Copy code

  3. Ensure Personnel Safety:
    • Activate emergency lighting to prevent accidents in dark areas.
    • Ensure all personnel remain calm and follow instructions from supervisors.
  4. Communicate the Outage:
    • Inform all employees about the power outage via public address systems or
other communication tools.
  • Notify the maintenance team and facility manager immediately.
  • Secure Equipment:
    • Shut down non-critical equipment to prevent damage when power is restored.
    • For critical systems, activate backup power sources, such as UPS units or generators.
  • 4.2 Activation of Backup Systems

    1. Switch to Generators:
      • Maintenance teams must activate backup generators to restore power to critical systems.
      • Ensure generators have sufficient fuel and are operating within safety parameters.
    2. less
      Copy code

    3. Use Uninterruptible Power Supplies (UPS):
      • For short-term outages, rely on UPS systems to maintain power for essential equipment.
      • Monitor UPS performance to ensure continued functionality until full power is restored.
    4. Prioritize Critical Areas:
      • Allocate backup power to critical systems, such as HVAC, fire safety, and essential production equipment.

    4.3 Monitoring During the Outage

    1. Inspect Systems:
      • Regularly check generators, UPS units, and other systems to ensure they are functioning properly.
    2. less
      Copy code

    3. Manage Operational Processes:
      • Pause production processes that cannot operate safely without full power.
      • Secure perishable or temperature-sensitive materials using backup HVAC systems.
    4. Document Activities:
      • Record actions taken during the outage in the Power Outage Log (Annexure 1).

    4.4 Post-Outage Recovery

    1. Power Restoration:
      • Confirm power restoration with the utility provider or facility management system.
      • Gradually switch off backup systems and transition to main power supply.
    2. less
      Copy code

    3. Equipment Inspection:
      • Inspect all equipment for potential damage or malfunctions caused by the outage.
    4. Restart Operations:
      • Resume production and other operations in a phased manner to prevent system overload.
    5. Report and Review:
      • Complete a post-outage report detailing the event, response actions, and any lessons learned.

    4.5 Preventive Measures

    1. Regular Maintenance:
      • Conduct periodic inspections of electrical systems, generators, and UPS units.
    2. less
      Copy code

    3. Emergency Supplies:
      • Maintain adequate fuel for generators and spare batteries for UPS systems.
    4. Training:
      • Train employees on power outage response procedures and the operation of backup systems.

    5) Abbreviations, if any

    • UPS: Uninterruptible Power Supply
    • ERT: Emergency Response Team

    6) Documents, if any

    • Power Outage Log
    • Post-Outage Report
    • Generator Maintenance Checklist

    7) Reference, if any

    • OSHA Electrical Safety Guidelines
    • NFPA Backup Power Standards
    • ISO 22301 Business Continuity Guidelines

    8) SOP Version

    Version: 1.0

    Annexure

    Template 1: Power Outage Log

     
    Date Time of Outage Duration Systems Affected Actions Taken
    DD/MM/YYYY 10:15 AM 45 Minutes Production Line A Activated Generator, Paused Production

    Template 2: Generator Maintenance Checklist

     
    Inspection Date Generator ID Fuel Level Battery Status Inspection Notes
    DD/MM/YYYY GEN-001 Full Charged No Issues
    See also  SOP for Preparing Incident and Accident Logs
    Environment, Health and Safety Tags:Emergency response for hazardous materials incidents, Hazardous materials classification, Hazardous materials compliance audits, Hazardous materials decontamination procedures, Hazardous materials disposal methods, Hazardous materials emergency planning, Hazardous materials emergency response guidebook, Hazardous materials exposure limits, Hazardous materials handling, Hazardous materials handling equipment, Hazardous materials incident command system, Hazardous materials incident reporting, Hazardous materials inventory management, Hazardous materials labeling requirements, Hazardous materials monitoring equipment, Hazardous materials packaging requirements, Hazardous materials placarding requirements, Hazardous materials regulatory agencies, Hazardous materials response team training, Hazardous materials risk assessment, Hazardous materials security plans, Hazardous materials shipping papers, Hazardous materials spill response, Hazardous materials storage guidelines, Hazardous materials training requirements, Hazardous materials transportation regulations, Hazardous materials transportation safety, Personal protective equipment for hazardous materials, Regulatory compliance in hazardous materials management, Safety procedures for hazardous materials

    Post navigation

    Previous Post: SOP for Handling Suspected Counterfeit or Adulterated Raw Materials – V 2.0
    Next Post: Ointments: SOP for Particle Size Reduction in Ointment Manufacturing – V 2.0

    Standard Operating Procedures V 1.0

    • Aerosols
    • Analytical Method Development
    • Bioequivalence Bioavailability Study
    • Capsule Formulation
    • Clinical Studies
    • Creams
    • Data Integrity
    • Dental Dosage Forms
    • Drug Discovery
    • Environment, Health and Safety
    • Formulation Development
    • Gels
    • Good Distribution Practice
    • Good Warehousing Practices
    • In-Process Control
    • Injectables
    • Liquid Orals
    • Liposome and Emulsion Formulations
    • Lotions
    • Lyophilized Products
    • Maintenance Dept.
    • Medical Devices
    • Metered-Dose Inhaler
    • Microbiology Testing
    • Nanoparticle Formulation
    • Nasal Spray Formulations
    • Nebulizers
    • Ocular (Eye) Dosage Forms
    • Ointments
    • Otic (Ear) Dosage Forms
    • Pharmacovigilance
    • Powder & Granules
    • Purchase Departments
    • Quality Assurance
    • Quality Control
    • Raw Material Stores
    • Regulatory Affairs
    • Tablet Manufacturing
    • Rectal Dosage Forms
    • Transdermal Patches
    • Vaginal Dosage Forms
    • Validations and Qualifications

    Read SOPs in your Language:

    English
     - 
    en
    Bengali
     - 
    bn
    English
     - 
    en
    Gujarati
     - 
    gu
    Hindi
     - 
    hi
    Malayalam
     - 
    ml
    Marathi
     - 
    mr
    Punjabi
     - 
    pa
    Tamil
     - 
    ta
    Telugu
     - 
    te

    NEW! Revised SOPs – V 2.0

    • Aerosols V 2.0
    • API Manufacturing V 2.0
    • BA-BE Studies V 2.0
    • Capsules V 2.0
    • Creams V 2.0
    • Ointments V 2.0
    • Raw Material Warehouse V 2.0
    • Tablet Manufacturing V2.0

    New Publication: A must for All.

    Copyright © 2025 SOP Guide for Pharma.

    Powered by PressBook WordPress theme

    Go to mobile version