SOP for Qualification of Depyrogenation Tunnels
The purpose of this Standard Operating Procedure (SOP) is to define the process for qualifying depyrogenation tunnels used in pharmaceutical manufacturing. This SOP ensures that the depyrogenation tunnels are correctly installed, calibrated, and operate in compliance with the required specifications. The qualification process verifies that the depyrogenation tunnels achieve the necessary temperatures and maintain the required duration to effectively remove pyrogens from containers, ensuring the sterility and safety of the pharmaceutical products.
Click to read the full article.